Project Details
This page displays current information for project DIME:214574.
Project Information
| Project Identifiers | Project ID: 214574 Permit Numbers: 0419NSN1668 0420NRT0247 04206DP0165 0419NSN1668 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-680-2.89 |
| Award Date | 08/01/2019 |
| Closeout Date | 04/27/2023 |
| Work Description | Restriping and signal modification.perform traffic control, remove existing stripe marking; install new striping by converting number 3 lane from shared through/right lane to a through lane only; install surface-mounted channelizers between lane 2 and 3 on westbound Bollinger Canyon Road; and insta |
| Location Description | i-680 at Bollinger Canyon Road Interchange, San Ramon |
| QA Service Level | 1 (Verified on 12/10/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jay.linnemann@dot.ca.gov | Jay Linnemann | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
