Project Details
This page displays current information for project DEA: 07316904.
Project Information
| Project Identifiers | Project ID: 214532 DEA: 07316904 EFIS: 0715000227 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-1,2,5,10-Various |
| Award Date | 01/24/2020 |
| Closeout Date | 08/24/2022 |
| Work Description | TUNNEL LIGHTING, MESSAGE SIGN SYSTEMS, RETAINING WALL & BUILDING WORK. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/15/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| frank.shin@dot.ca.gov | Frank Shin | Resident Engineer | Caltrans RE DB |
| frank.lotfi@dot.ca.gov | Frank Lotfi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 18 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-14-56 | 04/14/2025 | 04/14/2025 | Quality Assurance | Concrete | View |
| 2022-03-21-15 | 03/21/2022 | 03/23/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2021-11-08-24 | 11/08/2021 | 11/09/2021 | Department Acceptance | Soil | View |
| 2021-11-10-26 | 11/10/2021 | 11/10/2021 | Quality Control | Polyester | View |
| 2021-11-08-5 | 11/08/2021 | 11/09/2021 | Department Acceptance | Soil | View |
| 2021-08-27-19 | 08/27/2021 | 08/31/2021 | Verification | Asphalt Rubber Binder | View |
| 2021-08-27-18 | 08/27/2021 | 08/31/2021 | Verification | Crumb Rubber Modifier | View |
| 2021-08-27-17 | 08/27/2021 | 08/31/2021 | Verification | Crumb Rubber Modifier | View |
| 2021-08-27-13 | 08/27/2021 | 08/31/2021 | Verification | Aggregate | View |
| 2021-07-01-1 | 07/01/2021 | 07/09/2021 | Verification | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
