Project Details
This page displays current information for project DEA: 051H9804.
Project Information
| Project Identifiers | Project ID: 214520 DEA: 051H9804 EFIS: 0517000043 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-78.4/79.0 |
| Award Date | 01/08/2020 |
| Closeout Date | 09/25/2020 |
| Work Description | ROADWAY EXCAVATION, PLACE AGGREGATE BASE, HMA AND RHMA-G. |
| Location Description | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF SOLOMON SUMMIT UNDERCROSSING |
| QA Service Level | 1 (Verified on 02/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| lilian.Bennetzen@dot.ca.gov | Lilian (Poh Chu) Bennetzen | Resident Engineer | Caltrans RE DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 31 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-06-12-11 | 06/12/2020 | 06/15/2020 | Department Acceptance | Hot Mix Asphalt | View |
| 2020-05-19-17 | 05/19/2020 | 05/19/2020 | Department Acceptance | Hot Mix Asphalt | View |
| 2020-05-19-16 | 05/19/2020 | 05/19/2020 | Department Acceptance | Reclaimed Asphalt Pavement | View |
| 2020-05-22-5 | 05/22/2020 | 05/26/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-05-21-14 | 05/21/2020 | 05/26/2020 | Quality Assurance | Hot Mix Asphalt | View |
| 2020-05-21-13 | 05/21/2020 | Quality Assurance | Hot Mix Asphalt | View | |
| 2020-05-20-6 | 05/20/2020 | Quality Assurance | Hot Mix Asphalt | View | |
| 2020-05-20-2 | 05/20/2020 | 05/20/2020 | Department Acceptance | Hot Mix Asphalt | View |
| 2020-05-06-16 | 05/06/2020 | 05/13/2020 | Verification | Hot Mix Asphalt | View |
| 2020-05-06-15 | 05/06/2020 | 05/13/2020 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
