Project Details
This page displays current information for project DEA: 101C6204.
Project Information
| Project Identifiers | Project ID: 214393 DEA: 101C6204 EFIS: 1015000001 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ,MPA,MER,SBT,SJ,SCL-5,88,99,104,120,etc.-15.69/29.56 |
| Award Date | 02/06/2020 |
| Closeout Date | 07/15/2021 |
| Work Description | MODIFY ELECTRICAL SYSTEMS, INSTALL CAMERA SYSTEMS AND PLACE HMA. |
| Location Description | AMADOR, MARIPOSA, MERCED, SAN BENITO, SAN JOAQUIN, AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 09/13/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| obaidullah.rashid@dot.ca.gov | Obiadullah "Abdul" Rashid | Resident Engineer | Caltrans RE DB |
| darwin.vargas@dot.ca.gov | Darwin Vargas | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-10-02-1 | 10/02/2020 | 10/02/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2020-09-30-4 | 09/30/2020 | 10/02/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2020-09-30-3 | 09/30/2020 | 09/30/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
