Project Details
This page displays current information for project DEA: 120P94U4.
Project Information
| Project Identifiers | Project ID: 214345 DEA: 120P94U4 EFIS: 1217000076 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-133-3.2/R4.1 |
| Award Date | 02/23/2021 |
| Closeout Date | Not set |
| Work Description | ROADWAY WIDENING, RESTRIPING AND DRAINAGE WORK. |
| Location Description | ORANGE COUNTY IN THE CITY OF LAGUNA BEACH FROM 0.2 MILE SOUTH OF EL TORO ROAD TO ROUTE 73/133 SEPARATION |
| QA Service Level | 1 (Verified on 12/10/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Franklin.Luna@dot.ca.gov | Franklin Luna | Resident Engineer | Caltrans RE DB |
| Chungkeun.lee@dot.ca.gov | Chungkeun (Chung) Lee | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 40 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-27-34 | 10/27/2025 | 10/27/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-10-24-32 | 10/24/2025 | 10/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-10-09-72 | 10/09/2025 | 10/10/2025 | Quality Assurance | Concrete | View |
| 2025-10-23-32 | 10/23/2025 | 10/23/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-14-132 | 07/14/2025 | 07/15/2025 | Quality Control | Concrete | View |
| 2024-07-14-32 | 07/14/2024 | 07/14/2025 | Quality Control | Aggregate | View |
| 2025-09-11-43 | 09/11/2025 | 09/12/2025 | Quality Assurance | Concrete | View |
| 2025-08-01-31 | 08/01/2025 | 08/01/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-01-17 | 08/01/2025 | 08/01/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-23-51 | 07/23/2025 | 07/24/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||