Project Details
This page displays current information for project DEA: 120S2404.
Project Information
| Project Identifiers | Project ID: 214329 DEA: 120S2404 EFIS: 1220000002 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-91,90-6.42/6.5, 6.42 |
| Award Date | 07/23/2019 |
| Closeout Date | Not set |
| Work Description | repair a damage steel girder by heat straightening as a result of a high load vehicle hit |
| Location Description | Westbound Route 91 at La Palma Avenue Bridge Structure at PM 6.42 |
| QA Service Level | 1 (Verified on 08/15/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kifah.ramadan@dot.ca.gov | Kifah Ramadan | Resident Engineer | Caltrans RE DB |
| bassem.a.kabbara@dot.ca.gov | Bassem Kabbara | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-12-04-11 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-12-04-10 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-12-04-9 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-12-04-7 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-12-04-5 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-12-04-2 | 12/04/2019 | 12/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
