Project Details
This page displays current information for project DEA: 010J7304.
Project Information
| Project Identifiers | Project ID: 214274 DEA: 010J7304 EFIS: 0119000082 MINOR: 01A2002 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-1-18.0/23.0, 18.0-23.0 |
| Award Date | 03/28/2019 |
| Closeout Date | 11/17/2020 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Roozbeh.Hadipour@dot.ca.gov | Roozbeh Hadipour | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-09-27-3 | 09/27/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
