Project Details
This page displays current information for project DIME:214155.
Project Information
Project Identifiers | Project ID: 214155 Permit Numbers: 04166UT0590 04176RT1690 |
---|---|
DIST-CO-RTE-PM | 04---6.9/6.9 |
Award Date | 07/21/2016 |
Closeout Date | 11/30/00-1 |
Work Description | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. |
Location Description | 2370 Hecker pass, Gilroy |
QA Service Level | 1 (Verified on 08/28/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods