Project Details
This page displays current information for project DEA: 043Q9404.
Project Information
| Project Identifiers | Project ID: 214102 DEA: 043Q9404 EFIS: 0419000285 |
|---|---|
| DIST-CO-RTE-PM | 04-CC,CC,MRN-580-6.1/7.8, 0/2.7 |
| Award Date | 03/18/2019 |
| Closeout Date | 09/16/2020 |
| Work Description | Emergency joint replacement project |
| Location Description | Richmond San Rafael Bridge |
| QA Service Level | 1 (Verified on 03/04/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| behzad.halali@dot.ca.gov | Behzad Halali | Resident Engineer | Caltrans RE DB |
| david.quintana@dot.ca.gov | David Quintana | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-07-11-6 | 07/11/2019 | 07/16/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-07-11-1 | 07/11/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2019-06-04-13 | 06/04/2019 | 06/17/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
