Project Details
This page displays current information for project DIME:214100.
Project Information
Project Identifiers | Project ID: 214100 Permit Numbers: 08186CD0111 08166CD1029 |
---|---|
DIST-CO-RTE-PM | 08---37.819 |
Award Date | 11/22/2016 |
Closeout Date | 06/23/2021 |
Work Description | Enter onto Interstate 15 (I-15) right of way at Foothill Parkway/ El Cerrito Road Interchange in the City of Corona, to setup temporary traffic control and to perform the following: Construct new curb and gutter between Bedford Canyon Road and I-15 SB on-ramp for widening of Foothill Parkway, modif |
Location Description | El Cerrito Road / Foothill Pkwy, Corona |
QA Service Level | 1 (Verified on 06/14/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
payman.hatam@dot.ca.gov | Payman Hatam | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods