Project Details
This page displays current information for project DEA: 06484664.
Project Information
Project Identifiers | Project ID: 213916 DEA: 06484664 EFIS: 0618000213 COOP: 061681 |
---|---|
DIST-CO-RTE-PM | 06-KER-58,99-R52.1/R52.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | RT 58/99 BAKERSFIELD FREEWAY CONNECTOR -widening the existing SR 58/SR 99 grade separation structure and realigning the Westbound to Southbound loop connector. Auxiliary lane and collector-distributor lanes on Southbound SR 99. |
Location Description | SR 58/SR 99 |
QA Service Level | 2 (Verified on 03/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Kriston.pelz@aecom.com | Kriston Pelz | Resident Engineer | Caltrans RE DB |
kriston.pelz@aecom.com | Pelz Kriston | Structural Representative | Caltrans SR DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-10-16-1 | 10/16/2019 | 10/18/2019 | Department Acceptance | SMTL TM7 - Epoxy Coated Rebar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods