Project Details

This page displays current information for project DIME:213909.

Project Information

Project IdentifiersProject ID: 213909
Permit Numbers: 0618NTN0211 06196DP0068 0618NRT0988 0619NRT0152
DIST-CO-RTE-PM06-FRE-145-23.67
Award Date05/04/2018
Closeout Date11/30/00-1
Work DescriptionInstall 4-72" Rubber Gasket Reinforced Concrete Pipe (RGRCP) crossing under State Route 145 using Bore and Jack method (as shown on the attached plans). The bore and receiving pits are located outside the State Right of Way.
Location DescriptionFloral Av, Helm
QA Service Level1 (Verified on 03/12/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
No results found.

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods