Project Details
This page displays current information for project DIME:213883.
Project Information
Project Identifiers | Project ID: 213883 Permit Numbers: 11156UT0360 11166RW0101 |
---|---|
DIST-CO-RTE-PM | 11-SD-8-0.8/0.9 |
Award Date | 08/01/2015 |
Closeout Date | 08/18/2021 |
Work Description | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 8, postmiles 0.77-0.87 and 2.24, to trench and install approximately 770 feet of 12-inch natural gas pipeline, as shown on the attached plans, in accordance with the requirements and conditions contained herein a |
Location Description | INTERSTATE 8, SAN DIEGO |
QA Service Level | 1 (Verified on 08/18/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods