Project Details
This page displays current information for project DEA: 080Q9104.
Project Information
| Project Identifiers | Project ID: 213747 DEA: 080Q9104 EFIS: 0800020580 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-R23.8 |
| Award Date | 01/30/2019 |
| Closeout Date | 07/27/2022 |
| Work Description | RETROFIT BRIDGE PIER WALLS, FOOTINGS AND POLYESTER CONCRETE OVERLAY. |
| Location Description | SAN BERNARDINO COUNTY IN COLTON AT THE SANTA ANA RIVER BRIDGES |
| QA Service Level | 1 (Verified on 03/18/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| roberto.castro@dot.ca.gov | Roberto Castro | Resident Engineer | Caltrans RE DB |
| ching.chuang@dot.ca.gov | Ching Chuang | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 17 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-01-19-6 | 01/19/2022 | 01/19/2022 | Quality Control | Polyester | View |
| 2021-10-26-1 | 10/26/2021 | 11/01/2021 | Verification | SMTL TM5 - Threaded Bar | View |
| 2021-05-27-1 | 05/27/2021 | 05/28/2021 | Retest | SMTL TM5 - Welded Hoops | View |
| 2021-05-19-2 | 05/19/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2021-05-19-1 | 05/19/2021 | 05/21/2021 | Retest | SMTL TM5 - Welded Hoops | View |
| 2020-10-08-38 | 10/08/2020 | 10/20/2020 | Quality Assurance | Concrete | View |
| 2020-10-02-23 | 10/02/2020 | 10/20/2020 | Quality Assurance | Concrete | View |
| 2020-09-23-34 | 09/23/2020 | 10/01/2020 | Quality Assurance | Concrete | View |
| 2020-08-14-22 | 08/14/2020 | 08/14/2020 | Quality Assurance | Concrete | View |
| 2020-08-11-21 | 08/11/2020 | 08/21/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods