This page displays current information for project DEA: 081E6104.
Project Information
| Project Identifiers | Project ID: 213606 DEA: 081E6104 EFIS: 0814000055 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-62-41.0/41.5and60.6/61.1 |
| Award Date | 10/31/2018 |
| Closeout Date | 11/12/2019 |
| Work Description | WIDENING OF SHOULDER AND INSTALLING RUMBLE STRIPS |
| Location Description | SAN BERNARDINO COUNTY NEAR TWENTYNINE PALMS FROM 0.7 MILE TO 1.2 MILES EAST OF GODWIN ROAD AND FROM 5.6 MILES TO 6.1 MILES EAST OF IRONAGE ROAD |
| QA Service Level | 1 (Verified on 11/30/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| samer.georges@dot.ca.gov | Samer Georges | Resident Engineer | Caltrans RE DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-06-07-14 | 06/07/2019 | 06/07/2019 | Department Acceptance | Hot Mix Asphalt | View |
| 2019-06-07-10 | 06/07/2019 | 06/10/2019 | Department Acceptance | Aggregate | View |
| 2019-06-06-7 | 06/06/2019 | 06/07/2019 | Department Acceptance | Aggregate | View |
| 2019-05-17-13 | 05/17/2019 | 05/20/2019 | Department Acceptance | Hot Mix Asphalt | View |
| 2019-05-18-3 | 05/18/2019 | 05/20/2019 | Department Acceptance | Hot Mix Asphalt | View |
| 2019-05-18-1 | 05/18/2019 | 05/18/2019 | Department Acceptance | Aggregate | View |
| 2019-05-17-5 | 05/17/2019 | 05/17/2019 | Department Acceptance | Aggregate | View |
| 2019-05-03-12 | 05/03/2019 | 05/06/2019 | Department Acceptance | Hot Mix Asphalt | View |
| 2019-04-25-6 | 04/25/2019 | 05/06/2019 | Verification | Aggregate | View |
| 2019-04-24-33 | 04/24/2019 | 05/03/2019 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods