Project Details
This page displays current information for project DEA: 051A0004.
Project Information
Project Identifiers | Project ID: 213578 DEA: 051A0004 EFIS: 0500020284 |
---|---|
DIST-CO-RTE-PM | 05-MON-1-58.3/59.8 |
Award Date | 12/07/2018 |
Closeout Date | 10/29/2020 |
Work Description | WIDEN SHOULDERS OF EXISTING ROADBED AND UPGRADE GUARDRAIL |
Location Description | MONTEREY COUNTY ABOUT 13 MILES NORTH OF BIG SUR FROM 1 MILE SOUTH OF BIXBY CREEK BRIDGE TO 0.3 MILE SOUTH OF ROCKY CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/06/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pat.dussell@dot.ca.gov | Patrick Dussell | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods