Project Details
This page displays current information for project DIME:213548.
Project Information
| Project Identifiers | Project ID: 213548 Permit Numbers: 08176CD0701 08186RW1123 0818NUM8127 08186RW1155 08196RT0565 |
|---|---|
| DIST-CO-RTE-PM | 08--,15-16.17/16.3 |
| Award Date | 10/16/2017 |
| Closeout Date | 06/23/2021 |
| Work Description | Enter SR-74 right of way between the intersection of Collier and Central Avenues and the I-15 southbound on-ramp in the City of Lake Elsinore to construct street widening along the southeast side of Central Avenue to include the following: New and overlay pavement, curb & gutter, right-in only |
| Location Description | NEC of Central Ave and Collier ave, Lake Elsinore |
| QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
