Project Details
This page displays current information for project DEA: 010A8404.
Project Information
| Project Identifiers | Project ID: 213474 DEA: 010A8404 EFIS: 0113000058 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-271-17.7/18.0 |
| Award Date | 09/14/2018 |
| Closeout Date | 12/04/2019 |
| Work Description | BRIDGE REPLACEMENT, ROADWAY REALIGNMENT AND WIDENING. |
| Location Description | MENDOCINO COUNTY NEAR PIERCY FROM 0.7 MILE NORTH OF HIGHWAY 271/101 SEPARATION TO 0.4 MILE SOUTH OF THE SIDEHILL VIADUCT |
| QA Service Level | 1 (Verified on 08/24/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| joaquin.rodriguez@dot.ca.gov | Joaquin Rodriguez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-02-11-4 | 02/11/2019 | 02/14/2019 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2019-02-06-1 | 02/06/2019 | 02/08/2019 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2018-11-21-11 | 11/21/2018 | 11/22/2018 | Quality Assurance | Concrete | View |
| 2018-11-19-5 | 11/19/2018 | 11/20/2018 | Quality Assurance | Concrete | View |
| 2019-01-09-1 | 01/09/2019 | 01/10/2019 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
