Project Details
This page displays current information for project DEA: 11421204.
Project Information
| Project Identifiers | Project ID: 213387 DEA: 11421204 EFIS: 1115000083 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-52-13.3/14.8 |
| Award Date | 07/09/2018 |
| Closeout Date | 09/06/2019 |
| Work Description | INSTALL HIGH TENSION CABLE BARRIER, VEGETATION CONTROL |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO AND SANTEE FROM MAST BOULEVARD UNDERCROSSING TO MISSION GORGE ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 09/14/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ray.arinduque@dot.ca.gov | Ray Arinduque | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
