Project Details
This page displays current information for project DEA: 044J7104.
Project Information
| Project Identifiers | Project ID: 213246 DEA: 044J7104 EFIS: 0415000402 COOP: 042633 |
|---|---|
| DIST-CO-RTE-PM | 04--- |
| Award Date | 11/08/2018 |
| Closeout Date | 05/12/2021 |
| Work Description | Package B – Bicycle/Pedestrian Path on RSR Bridge and in Marin County Package C – Barrier on RSR Bridge and Barrier Transfer Machine |
| Location Description | Package B will extend/continue the path from the Stenmark Dr /Western Dr/Toll Plaza location in Contra Costa County across the RSR Bridge, down the WB I-580 Main St Off-Ramp onto E Francisco Blvd ending at Grange Ave in Marin County. |
| QA Service Level | 2 (Verified on 03/30/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Michael.J.Scott@wsp.com | Michael Scott | Oversight Resident Engineer | Caltrans REO DB |
| david.quintana@dot.ca.gov | Dave Quintana | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
