Project Details
This page displays current information for project DEA: 03372814.
Project Information
| Project Identifiers | Project ID: 213132 DEA: 03372814 EFIS: 0314000301 Permit Numbers: 0317AOP0994 0318ADP0096 |
|---|---|
| DIST-CO-RTE-PM | 03-ED-50-16/16.6 |
| Award Date | 01/09/2019 |
| Closeout Date | 07/27/2020 |
| Work Description | Western Placerville Interchanges Project Phase 2. Construction of EB auxiliary lane Forni Road, EB off ramp at Ray Lawyer Drive, a storm water detention basin and a signalized intersection at Ray Lawyer Drive. |
| Location Description | US 50, Placerville |
| QA Service Level | 2 (Verified on 02/16/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| juanah.koker@dot.ca.gov | Juanah Koker | Resident Engineer | Caltrans RE DB |
| hzabell@drakehaglan.com | Howard Zabell | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
