Project Details
This page displays current information for project DIME:213131.
Project Information
| Project Identifiers | Project ID: 213131 Permit Numbers: 11176UT0463 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-15-14.28/14.28 |
| Award Date | 01/29/2018 |
| Closeout Date | 08/24/2021 |
| Work Description | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 15, post mile M14.28 to install 230 KV underground electrical cables and conduits by the jack and bore and trenching methods, as shown on the attached plans, pursuant to the requirements and conditions contained |
| Location Description | INTERSTATE 15, SAN DIEGO |
| QA Service Level | 1 (Verified on 02/16/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nadine.l.martin@dot.ca.gov | Nadine Martin | Resident Engineer | Caltrans RE DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods