Project Details
This page displays current information for project DEA: 044G8904.
Project Information
| Project Identifiers | Project ID: 213074 DEA: 044G8904 EFIS: 0413000059 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-580-5.8 |
| Award Date | 05/10/2018 |
| Closeout Date | 03/12/2020 |
| Work Description | BIDGE SEISMIC RETROFIT |
| Location Description | CONTRA COSTA COUNTY IN RICHMOND AT SCOFIELD AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 02/13/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jason.trinh@dot.ca.gov | Jason Trinh | Resident Engineer | Caltrans RE DB |
| eric.urmeneta@dot.ca.gov | Eric Urmeneta | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-05-08-14 | 05/08/2019 | 05/08/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-04-23-4 | 04/23/2019 | 04/25/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-04-23-1 | 04/23/2019 | 04/26/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-03-14-11 | 03/14/2019 | Verification | Asphalt Binder | View | |
| 2019-03-14-10 | 03/14/2019 | 03/15/2019 | Verification | Aggregate | View |
| 2019-03-14-9 | 03/14/2019 | 03/15/2019 | Verification | Asphalt Binder | View |
| 2019-02-07-5 | 02/07/2019 | 02/07/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-02-07-4 | 02/07/2019 | 02/07/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-02-07-2 | 02/07/2019 | 02/07/2019 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-33-2019-70 | Submittal Accepted for Verification | CT HQ - Vallejo Field Laboratory | 03/15/2019 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
