Project Details
This page displays current information for project DEA: 051J5204.
Project Information
| Project Identifiers | Project ID: 213050 DEA: 051J5204 EFIS: 0517000195 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-58-6.9/30.0 |
| Award Date | 03/19/2018 |
| Closeout Date | 12/30/2019 |
| Work Description | COLD PLANE EXISTING ROADWAY AND RESURFACE WITH RHMA-G. |
| Location Description | SAN LUIS OBISPO COUNTY ABOUT 6 MILES EAST OF SANTA MARGARITA FROM ROUTE 229 TO NAVAJO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 09/06/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| lilian.Bennetzen@dot.ca.gov | Lilian Bennetzen | Resident Engineer | Caltrans RE DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-04-15-20 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Aggregate | View |
| 2019-04-15-19 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Aggregate | View |
| 2019-04-15-18 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-17 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-16 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-15 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-14 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-13 | 04/15/2019 | 04/16/2019 | Dispute Resolution | Hot Mix Asphalt | View |
| 2019-04-15-12 | 04/15/2019 | 04/15/2019 | Dispute Resolution | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
