Project Details
This page displays current information for project DEA: 01262044.
Project Information
| Project Identifiers | Project ID: 212995 DEA: 01262044 EFIS: 0112000203 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-101-47.2/47.3 |
| Award Date | 03/29/2018 |
| Closeout Date | 10/05/2020 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 06/26/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nash.munes@dot.ca.gov | Nash Munes | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-06-14-1 | 06/14/2019 | 06/14/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-09-18-2 | 09/18/2018 | 09/18/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-08-27-9 | 08/27/2018 | 08/27/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2018-08-08-14 | 08/08/2018 | 08/10/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2018-08-08-6 | 08/08/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View | |
| 2018-07-26-7 | 07/26/2018 | 07/30/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2018-07-18-18 | 07/18/2018 | Department Acceptance | SMTL TM5 - Threaded Bar | View | |
| 2018-07-18-17 | 07/18/2018 | Department Acceptance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
