Project Details
This page displays current information for project DEA: 080R3404.
Project Information
| Project Identifiers | Project ID: 212956 DEA: 080R3404 EFIS: 0812000072 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-38-30.9 |
| Award Date | 03/06/2018 |
| Closeout Date | 09/30/2019 |
| Work Description | BRIDGE REHABILITATION AND UPGRADE BRIDGE RAILING TO STANDARDS |
| Location Description | SAN BERNARDINO COUNTY NEAR ANGELUS OAKS AT SANTA ANA RIVER BRIDGERAM |
| QA Service Level | 1 (Verified on 05/09/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ken.t.tran@dot.ca.gov | Ken Tran | Resident Engineer | Caltrans RE DB |
| sylvia.r.stracner@dot.ca.gov | Sylvia Stracner | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-07-26-9 | 07/26/2019 | 07/31/2019 | Department Acceptance | Hot Mix Asphalt | View |
| 2019-05-02-16 | 05/02/2019 | 05/22/2019 | Verification | Aggregate | View |
| 2019-04-05-13 | 04/05/2019 | 04/05/2019 | Quality Assurance | Polyester | View |
| 2019-04-05-12 | 04/05/2019 | 04/05/2019 | Quality Assurance | Methacrylate | View |
| 2018-11-19-4 | 11/19/2018 | 11/20/2018 | Quality Assurance | Concrete | View |
| 2018-10-02-4 | 10/02/2018 | 10/04/2018 | Quality Assurance | Concrete | View |
| 2018-08-22-6 | 08/22/2018 | 08/22/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-08-22-3 | 08/22/2018 | 08/22/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-08-22-2 | 08/22/2018 | 08/22/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-08-17-3 | 08/17/2018 | 08/17/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
