Project Details
This page displays current information for project EFIS: 0415000339.
Project Information
| Project Identifiers | Project ID: 212922 EFIS: 0415000339 Permit Numbers: 0417NOP1834 04176DP2017 04176DP2005 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-82-6/6.8 |
| Award Date | 09/12/2017 |
| Closeout Date | 01/22/2020 |
| Work Description | the Project improvements within Caltrans right-of-way include enhancing pedestrian facilities by widening existing sidewalks, utility adjustments, improving lighting, modifying drainage, installing crosswalk, and reconstructing curb ramps at Holly St., San Carlos Ave., and Cherry St... |
| Location Description | El Camino Real, San Carlos |
| QA Service Level | 1 (Verified on 05/30/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| douglas.inori@dot.ca.gov | Doug Inori | Resident Engineer | Caltrans RE DB |
| tongthawornk@samtrans.com | Kitt Tongthaworn | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
