Project Details
This page displays current information for project DEA: 050F9704.
Project Information
Project Identifiers | Project ID: 212880 DEA: 050F9704 EFIS: 0513000017 |
---|---|
DIST-CO-RTE-PM | 05-MON-101-62.7 |
Award Date | 03/17/2022 |
Closeout Date | 02/14/2024 |
Work Description | N. SOLEDAD OH DECK REPLACEMENT |
Location Description | ON RTE 101 IN MONTEREY COUNTY NEAR SOLEDAD AT THE NORTH SOLEDAD OH BRIDGE BR 44-0091L/R |
QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
baljinder.s.brar@dot.ca.gov | Baljinder Brar | Resident Engineer | Caltrans RE DB |
drussu@mnsengineers.com | Dean Russu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-12-75 | 05/12/2023 | 05/23/2023 | Quality Assurance | Asphalt Rubber Binder | View |
2023-05-11-84 | 05/11/2023 | 05/23/2023 | Quality Assurance | Asphalt Rubber Binder | View |
2023-05-11-82 | 05/11/2023 | 05/23/2023 | Department Acceptance | Asphaltic Emulsion | View |
2023-05-13-7 | 05/13/2023 | 05/23/2023 | Department Acceptance | Asphaltic Emulsion | View |
2023-05-09-40 | 05/09/2023 | 05/09/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2022-09-23-69 | 09/23/2022 | 12/06/2022 | Authorization | Rapid Set | View |
2022-12-01-4 | 12/01/2022 | 11/10/2022 | Quality Assurance | Rapid Set | View |
2017-10-27-4 | 10/27/2017 | 11/08/2017 | Quality Control | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods