Project Details
This page displays current information for project DEA: 050F9704.
Project Information
| Project Identifiers | Project ID: 212880 DEA: 050F9704 EFIS: 0513000017 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-101-62.7 |
| Award Date | 03/17/2022 |
| Closeout Date | 02/14/2024 |
| Work Description | N. SOLEDAD OH DECK REPLACEMENT |
| Location Description | ON RTE 101 IN MONTEREY COUNTY NEAR SOLEDAD AT THE NORTH SOLEDAD OH BRIDGE BR 44-0091L/R |
| QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| baljinder.s.brar@dot.ca.gov | Baljinder Brar | Resident Engineer | Caltrans RE DB |
| drussu@mnsengineers.com | Dean Russu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-05-12-75 | 05/12/2023 | 05/23/2023 | Quality Assurance | Asphalt Rubber Binder | View |
| 2023-05-11-84 | 05/11/2023 | 05/23/2023 | Quality Assurance | Asphalt Rubber Binder | View |
| 2023-05-11-82 | 05/11/2023 | 05/23/2023 | Department Acceptance | Asphaltic Emulsion | View |
| 2023-05-13-7 | 05/13/2023 | 05/23/2023 | Department Acceptance | Asphaltic Emulsion | View |
| 2023-05-09-40 | 05/09/2023 | 05/09/2023 | Department Acceptance | Roadway/Bridge Surface | View |
| 2022-09-23-69 | 09/23/2022 | 12/06/2022 | Authorization | Rapid Set | View |
| 2022-12-01-4 | 12/01/2022 | 11/10/2022 | Quality Assurance | Rapid Set | View |
| 2017-10-27-4 | 10/27/2017 | 11/08/2017 | Quality Control | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
