Project Details
This page displays current information for project DEA: 101J3204.
Project Information
| Project Identifiers | Project ID: 212878 DEA: 101J3204 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-99-30.73 |
| Award Date | Not set |
| Closeout Date | 07/28/2021 |
| Work Description | Remove and replace damaged girder 1 in Span 2 |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/19/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ranbir.bhullar@dot.ca.gov | Ranbir Bhullar | Resident Engineer | Caltrans RE DB |
| chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-02-08-6 | 02/08/2018 | 02/09/2018 | Quality Assurance | Concrete | View |
| 2018-02-08-5 | 02/08/2018 | 02/09/2018 | Quality Assurance | Concrete | View |
| 2018-02-08-4 | 02/08/2018 | 02/09/2018 | Quality Assurance | Concrete | View |
| 2018-02-08-3 | 02/08/2018 | 02/09/2018 | Quality Assurance | Concrete | View |
| 2018-02-08-2 | 02/08/2018 | 02/09/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
