Project Details
This page displays current information for project DEA: 07302204.
Project Information
| Project Identifiers | Project ID: 212872 DEA: 07302204 EFIS: 0713000481 |
|---|---|
| DIST-CO-RTE-PM | 07-VEN-126-0.0/R13.6 |
| Award Date | 01/24/2018 |
| Closeout Date | 05/26/2022 |
| Work Description | PLACE HOT MIX ASPHALT AND INDIVIDUAL SLAB REPLACEMENT. |
| Location Description | VENTURA COUNTY IN VENTURA AND SANTA PAULA FROM ROUTE 126/101 SEPARATION TO HAUN CREEK BRIDGE |
| QA Service Level | 1 (Verified on 04/27/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hector.arroyo@dot.ca.gov | Hector Arroyo | Resident Engineer | Caltrans RE DB |
| pantaleon.rivera@dot.ca.gov | Pantaleon Riverra Iii | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-09-21-27 | 09/21/2020 | 09/25/2020 | Verification | Aggregate | View |
| 2019-04-16-22 | 04/16/2019 | 04/22/2019 | Verification | Aggregate | View |
| 2019-03-01-7 | 03/01/2019 | 03/01/2019 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
