Project Details
This page displays current information for project DEA: 080R3504.
Project Information
| Project Identifiers | Project ID: 212830 DEA: 080R3504 EFIS: 0812000071 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-111-10-R16.1-111-R60.5 |
| Award Date | 01/29/2018 |
| Closeout Date | 12/12/2019 |
| Work Description | FRP COMPOSITE SYSTEM FOR COLUMNS. HINGES RESTRAINERS ON THE DECKS |
| Location Description | RIVERSIDE COUNTY IN BANNING AND PALM SPRING AT SAN GORGONIO WASH BRIDGE AND AT WHITEWATER RIVER OVERFLOW BRIDGE |
| QA Service Level | 1 (Verified on 03/01/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| xavier.avila@dot.ca.gov | Xavier Avila | Resident Engineer | Caltrans RE DB |
| shukri.abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-07-02-17 | 07/02/2018 | 07/16/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2018-06-06-2 | 06/06/2018 | 06/15/2018 | Department Acceptance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
