Project Details
This page displays current information for project DEA: 100G8304.
Project Information
| Project Identifiers | Project ID: 212800 DEA: 100G8304 EFIS: 1012000316 |
|---|---|
| DIST-CO-RTE-PM | 10-MER-152,140,152-Var |
| Award Date | 10/31/2023 |
| Closeout Date | Not set |
| Work Description | MERCED SEISMIC RESTORATION |
| Location Description | IN MERCED COUNTY ON STATE ROUTES, 59, 140 AND 152 AT VARIOUS BRIDGES. |
| QA Service Level | 1 (Verified on 12/20/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jagga.dhami@dot.ca.gov | Jagga Dhami | Resident Engineer | Caltrans RE DB |
| natasha.collins@dot.ca.gov | Natasha Collins | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 34 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-03-97 | 06/03/2025 | 06/03/2025 | Quality Control | Concrete | View |
| 2025-07-09-8 | 07/09/2025 | 07/09/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-04-02-4 | 04/02/2025 | 04/02/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2024-11-09-6 | 11/09/2024 | 11/09/2024 | Quality Control | Concrete | View |
| 2024-11-07-60 | 11/07/2024 | 11/07/2024 | Quality Control | Concrete | View |
| 2024-10-31-76 | 10/31/2024 | 10/31/2024 | Quality Control | Concrete | View |
| 2024-10-31-75 | 10/31/2024 | 10/31/2024 | Quality Control | Concrete | View |
| 2024-10-03-126 | 10/03/2024 | 10/03/2024 | Quality Control | Concrete | View |
| 2024-09-13-75 | 09/13/2024 | 09/13/2024 | Quality Control | Concrete | View |
| 2024-10-18-30 | 10/18/2024 | 10/18/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
