Project Details
This page displays current information for project DIME:212754.
Project Information
| Project Identifiers | Project ID: 212754 Permit Numbers: 08176MC0003 08186RT0123 08186RT0927 |
|---|---|
| DIST-CO-RTE-PM | 08---19.6/19.8 |
| Award Date | 07/27/2017 |
| Closeout Date | 11/30/00-1 |
| Work Description | Enter onto State Route 79 (SR-79) right-of-way at Bedford Court, City of Temecula to construct/install new curb, gutter, commercial driveway, sidewalk, curb ramps, and modify traffic signals, lighting, traffic striping/signage, and landscape irrigation as per plans date stamped, July 12, 2017 by th |
| Location Description | Temecula Parkway/Bedford Ct., Temecula |
| QA Service Level | 1 (Verified on 09/26/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| viren.bhatt@dot.ca.gov | Viren Bhatt | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
