Project Details
This page displays current information for project DEA: 030F3514.
Project Information
| Project Identifiers | Project ID: 212726 DEA: 030F3514 EFIS: 0316000080 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-51,99-VAR |
| Award Date | 02/08/2018 |
| Closeout Date | 12/08/2021 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT AND MODIFY ELECTRICAL SYSTEM; SOLDIER PILES; CONCRETE RETAINING WALL |
| Location Description | SACRAMENTO COUNTY FROM 0.5 MILE SOUTH OF COSUMNES RIVER BOULEVARD TO 0.2 MILE EAST OF ARDEN WAY UNDERCROSSING |
| QA Service Level | 1 (Verified on 04/02/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| brent.bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 43 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-03-21-1 | 03/21/2019 | 03/25/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-02-25-4 | 02/25/2019 | 02/26/2019 | Quality Assurance | Concrete | View |
| 2019-02-25-3 | 02/25/2019 | 02/26/2019 | Quality Assurance | Concrete | View |
| 2019-02-21-1 | 02/21/2019 | 02/22/2019 | Quality Assurance | Concrete | View |
| 2019-01-25-3 | 01/25/2019 | 01/28/2019 | Quality Assurance | Concrete | View |
| 2019-01-11-5 | 01/11/2019 | 01/14/2019 | Quality Assurance | Concrete | View |
| 2019-01-11-4 | 01/11/2019 | 01/14/2019 | Quality Assurance | Concrete | View |
| 2019-01-04-2 | 01/04/2019 | 01/07/2019 | Quality Assurance | Concrete | View |
| 2019-01-04-1 | 01/04/2019 | 01/07/2019 | Quality Assurance | Concrete | View |
| 2018-12-21-4 | 12/21/2018 | 12/24/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
