Project Details
This page displays current information for project DEA: 033H6804.
Project Information
| Project Identifiers | Project ID: 212625 DEA: 033H6804 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-80-50.7/51.0 |
| Award Date | 08/09/2017 |
| Closeout Date | 07/27/2018 |
| Work Description | Repair embankment and install geostabilization |
| Location Description | In Placer County on Route 80 at Whitmore Maintenance Station |
| QA Service Level | 1 (Verified on 09/18/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
