Project Details
This page displays current information for project DEA: 051F0804.
Project Information
| Project Identifiers | Project ID: 212622 DEA: 051F0804 EFIS: 0513000052 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-1-2.5-67.3 |
| Award Date | 10/02/2018 |
| Closeout Date | 08/23/2021 |
| Work Description | REPLACEMENT OF 7 CULVERTS ALONG HWY 1. |
| Location Description | ON ROUTE 1 IN MONTEREY COUNTY AT VARIOUS LOCATIONS BETWEEN 2.5 MILES NORTH OF THE MONTEREY/SAN LUIS OBISPO COUNTY LINE AND 0.6 MILES SOUTH OF MALPASO CREEK BRIDGE. |
| QA Service Level | 1 (Verified on 09/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-07-27-16 | 07/27/2017 | 08/09/2017 | Quality Control | Soil | View |
| 2017-07-27-15 | 07/27/2017 | 08/09/2017 | Quality Control | Soil | View |
| 2017-08-01-22 | 08/01/2017 | 08/09/2017 | Quality Control | Soil | View |
| 2017-08-01-21 | 08/01/2017 | 08/09/2017 | Quality Control | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
