Project Details
This page displays current information for project DEA: 100L0204.
Project Information
| Project Identifiers | Project ID: 212596 DEA: 100L0204 EFIS: 1013000053 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ,STA-99-0.0-0.7:24.4-24.8 |
| Award Date | 11/30/2018 |
| Closeout Date | 07/15/2021 |
| Work Description | Partial Bridge Replacement |
| Location Description | ON ROUTE 99 IN RIPON AT THE COUNTY LINE OF SAN JOAQUIN COUNTY AND STANISLAUS COUNTY AT THE STANISLAUS RIVER BRIDGES (29-0013L/R). |
| QA Service Level | 1 (Verified on 12/19/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| harminder.deol@dot.ca.gov | Harminder Deol | Resident Engineer | Caltrans RE DB |
| george.samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-07-31-3 | 07/31/2020 | 08/06/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-09-18-2 | 09/18/2019 | 09/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2019-08-21-8 | 08/21/2019 | 08/21/2019 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2017-07-10-7 | 07/10/2017 | 07/28/2017 | Quality Control | Soil | View |
| 2017-07-10-6 | 07/10/2017 | 07/28/2017 | Quality Control | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
