Project Details
This page displays current information for project DIME:212579.
Project Information
| Project Identifiers | Project ID: 212579 Permit Numbers: 05146MC0394 05166RW0400 05176DP0473 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-21.1/21.2 |
| Award Date | 02/24/2015 |
| Closeout Date | 08/19/2019 |
| Work Description | Restripe traffic lanes on Patterson Avenue Overcrossing (Br. No. 51-165) to provide dual left turn lanes and install a ramp meter system for Hwy 101 southbound on-ramp |
| Location Description | Hwy 101, Goleta |
| QA Service Level | 1 (Verified on 07/25/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
