Project Details
This page displays current information for project DEA: 044G2204.
Project Information
| Project Identifiers | Project ID: 212345 DEA: 044G2204 EFIS: 0412000314 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-12-17.75-18.20 |
| Award Date | 12/06/2017 |
| Closeout Date | 03/12/2021 |
| Work Description | PROJECT: SONOMA 12 FARMERS LANE MEDIAN BARRIER MICROPILES |
| Location Description | IN SONOMA COUNTY ON ROUTE 12, IN SANTA ROSA FROM FARMERS LANE TO BRUSH CREEK RD. |
| QA Service Level | 1 (Verified on 10/18/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| scott.hislop@dot.ca.gov | Scott Hislop | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-06-19-8 | 06/19/2019 | 06/24/2019 | Quality Assurance | Concrete | View |
| 2019-06-19-7 | 06/19/2019 | 06/24/2019 | Quality Assurance | Concrete | View |
| 2019-06-19-6 | 06/19/2019 | 06/24/2019 | Quality Assurance | Concrete | View |
| 2019-06-19-5 | 06/19/2019 | 06/24/2019 | Quality Assurance | Concrete | View |
| 2019-04-17-19 | 04/17/2019 | 05/02/2019 | Quality Assurance | Concrete | View |
| 2019-04-24-29 | 04/24/2019 | 05/02/2019 | Quality Assurance | Concrete | View |
| 2018-10-02-6 | 10/02/2018 | 10/05/2018 | Quality Control | Concrete | View |
| 2018-10-02-5 | 10/02/2018 | 10/05/2018 | Quality Control | Concrete | View |
| 2018-08-21-14 | 08/21/2018 | 08/24/2018 | Quality Assurance | Concrete | View |
| 2018-08-21-10 | 08/21/2018 | 08/24/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
