Project Details
This page displays current information for project DEA: 033F5604.
Project Information
| Project Identifiers | Project ID: 212252 DEA: 033F5604 EFIS: 0313000033 |
|---|---|
| DIST-CO-RTE-PM | 03-SUT,YUB-20-17.0/17.1,0.0/0.4 |
| Award Date | 02/11/2021 |
| Closeout Date | 01/25/2023 |
| Work Description | INSTALL CAST-IN-STEEL SHELL CONCRETE PILE. |
| Location Description | SUTTER AND YUBA COUNTIES IN YUBA CITY AND MARYSVILLE AT THE FEATHER RIVER BRIDGE AND OVERHEAD |
| QA Service Level | 1 (Verified on 04/27/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Selvendran.Manoharan@dot.ca.gov | Selvendran Manoharan | Resident Engineer | Caltrans RE DB |
| brent_bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 47 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-02-07-9 | 02/07/2024 | 02/08/2024 | Quality Assurance | Concrete | View |
| 2024-01-31-19 | 01/31/2024 | 02/01/2024 | Quality Assurance | Concrete | View |
| 2024-01-30-31 | 01/30/2024 | 02/01/2024 | Quality Assurance | Concrete | View |
| 2024-01-26-31 | 01/26/2024 | 01/30/2024 | Quality Assurance | Concrete | View |
| 2023-12-09-1 | 12/09/2023 | 12/11/2023 | Quality Assurance | Concrete | View |
| 2021-11-12-13 | 11/12/2021 | 11/16/2021 | Quality Assurance | Concrete | View |
| 2021-11-12-12 | 11/12/2021 | 11/16/2021 | Quality Assurance | Concrete | View |
| 2021-11-12-11 | 11/12/2021 | 11/16/2021 | Quality Assurance | Concrete | View |
| 2021-11-04-13 | 11/04/2021 | 11/05/2021 | Quality Assurance | Concrete | View |
| 2021-11-04-12 | 11/04/2021 | 11/05/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
