Project Details
This page displays current information for project DEA: 044G8404.
Project Information
Project Identifiers | Project ID: 212244 DEA: 044G8404 EFIS: 0413000051 |
---|---|
DIST-CO-RTE-PM | 04-NAP-128-20.1/20.4 |
Award Date | 02/19/2019 |
Closeout Date | 06/27/2023 |
Work Description | REPLACE CAPELL CREEK BRIDGE |
Location Description | NAPA COUNTY ABOUT 15 MILES EAST OF RUTHERFORD FROM 1.1 MILES EAST OF KNOXVILLE ROAD TO 0.3 MILE WEST OF CAPELL VALLEY CREST |
QA Service Level | 1 (Verified on 05/20/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darren.isada@dot.ca.gov | Darren Isada | Resident Engineer | Caltrans RE DB |
nana.budu@dot.ca.gov | Nana Budu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 114 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-12-12 | 01/12/2022 | 01/14/2022 | Quality Assurance | Concrete | View |
2022-01-12-11 | 01/12/2022 | 01/14/2022 | Quality Assurance | Concrete | View |
2021-10-09-3 | 10/09/2021 | 10/14/2021 | Quality Assurance | Concrete | View |
2021-08-26-16 | 08/26/2021 | 08/30/2021 | Quality Assurance | Concrete | View |
2021-08-26-15 | 08/26/2021 | 08/30/2021 | Quality Assurance | Concrete | View |
2021-08-26-14 | 08/26/2021 | 08/30/2021 | Quality Assurance | Concrete | View |
2021-04-15-23 | 04/15/2021 | 05/06/2021 | Quality Assurance | Concrete | View |
2021-04-19-5 | 04/19/2021 | 04/21/2021 | Quality Assurance | Concrete | View |
2021-04-15-13 | 04/15/2021 | 04/21/2021 | Quality Assurance | Concrete | View |
2021-03-30-10 | 03/30/2021 | 04/01/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods