Project Details
This page displays current information for project DEA: 024G5204.
Project Information
Project Identifiers | Project ID: 212185 DEA: 024G5204 EFIS: 0214000022 |
---|---|
DIST-CO-RTE-PM | 02-SHA-5-R28.0 - R29.2 |
Award Date | 05/21/2018 |
Closeout Date | 09/02/2020 |
Work Description | PIT RIVER BRIDGE DECK & CATWALK REHABILITATION |
Location Description | SHASTA COUNTY ABOUT 6 MILES NORTH OF SHASTA LAKE FROM 0.2 MILE SOUTH TO 0.9 MILE NORTH OF PIT RIVER BRIDGE OVERHEAD |
QA Service Level | 1 (Verified on 06/05/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tofael.anwar@dot.ca.gov | Tofael Anwar | Resident Engineer | Caltrans RE DB |
Andy.OSullivan@dot.ca.gov | Andrew Osullivan | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-06-13-2 | 06/13/2019 | 06/13/2019 | Quality Control | Polyester | View |
2019-01-28-13 | 01/28/2019 | 02/14/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-02-06-10 | 02/06/2019 | 02/06/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-01-08-1 | 01/08/2019 | 01/09/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods