Project Details
This page displays current information for project DEA: 051J1304.
Project Information
| Project Identifiers | Project ID: 212164 DEA: 051J1304 EFIS: 0517000064 |
|---|---|
| DIST-CO-RTE-PM | 05-MON,MON-1-45.52, 45.4/45.8 |
| Award Date | 02/16/2017 |
| Closeout Date | 10/25/2019 |
| Work Description | Pfeiffer Canyon Emergency Bridge Replacement Project |
| Location Description | Highway 1 at Pfeiffer State Park |
| QA Service Level | 1 (Verified on 02/27/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tyler.lavering@dot.ca.gov | Tyler Lavering | Resident Engineer | Caltrans RE DB |
| david.galarza@dot.ca.gov | David Galarza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-08-25-3 | 08/25/2017 | 08/28/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-07-07-12 | 07/07/2017 | 07/12/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-06-23-11 | 06/23/2017 | 06/28/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-05-24-6 | 05/24/2017 | 05/31/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-05-09-12 | 05/09/2017 | 05/24/2017 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2017-05-03-1 | 05/03/2017 | 05/05/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-04-17-3 | 04/17/2017 | 04/18/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2017-04-17-2 | 04/17/2017 | 04/18/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2017-04-17-1 | 04/17/2017 | 04/18/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
| 2017-04-12-5 | 04/12/2017 | 04/12/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
