Project Details
This page displays current information for project DIME:211993.
Project Information
| Project Identifiers | Project ID: 211993 Permit Numbers: 08166CD0180 08166UJ0825 08166UL1027 08176RW0109 |
|---|---|
| DIST-CO-RTE-PM | 08--74-34.22/34.34 |
| Award Date | 10/28/2016 |
| Closeout Date | 09/04/2018 |
| Work Description | Enter onto State right-of-way within the State Route 74 and State Route 79 to setup traffic control to construct new sidewalk, curb & gutter, curb returns/ramps, raised-curb median, storm drain pipe, pavement widening, grind & overlay new pavement, and to install signal modifications, new s |
| Location Description | SW Corner of SR 74 and SR 79, Unincorporated Hemet |
| QA Service Level | 1 (Verified on 01/25/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arfan.haidary@dot.ca.gov | Arfan Haidary | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
