Project Details
This page displays current information for project DEA: 06457114.
Project Information
| Project Identifiers | Project ID: 211917 DEA: 06457114 EFIS: 0600020478 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-14,178-58.2/62.3,88.3/88.9 |
| Award Date | 03/14/2017 |
| Closeout Date | 12/07/2018 |
| Work Description | RECONSTRUCT HIGHWAY FROM 2-LANE CONVENTIONAL TO 4-LANE EXPRESSWAY. |
| Location Description | KERN COUNTY NEAR INDIAN WELLS ON ROUTE 14 FROM 2.4 MILES SOUTH OF JUNCTION ROUTE 178 TO 1.7 MILES NORTH OF JUNCTION ROUTE 178 AND ON ROUTE 178 FROM ROUTE 14 TO 0.6 MILE EAST OF ROUTE 14 |
| QA Service Level | 1 (Verified on 03/03/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| sam.dhaliwal@dot.ca.gov | Sam Dhaliwal | Resident Engineer | Caltrans RE DB |
| eduardo.reyes@dot.ca.gov | Eduardo Reyes | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
