Project Details
This page displays current information for project DEA: 080G8424.
Project Information
| Project Identifiers | Project ID: 211797 DEA: 080G8424 EFIS: 0814000184 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-R107.3 |
| Award Date | 12/29/2016 |
| Closeout Date | 06/23/2021 |
| Work Description | UPGRADE EXISTING SAFETY ROADSIDE REST AREAS (SRRA) |
| Location Description | SAN BERNARDINO COUNTY ABOUT 30 MILES EAST OF BARSTOW AT C.V. KANE SAFETY ROADSIDE REST AREA |
| QA Service Level | 1 (Verified on 02/08/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| khoa.n.nguyen@dot.ca.gov | Khoa Nguyen | Resident Engineer | Caltrans RE DB |
| leonard.romero@dot.ca.gov | Leonard J Romero | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-03-07-2 | 03/07/2018 | 03/15/2018 | Quality Assurance | Concrete | View |
| 2018-02-07-3 | 02/07/2018 | 02/08/2018 | Verification | SMTL TM3 - Fastener Assembly | View |
| 2018-01-08-3 | 01/08/2018 | 01/15/2018 | Quality Control | Concrete | View |
| 2018-01-08-2 | 01/08/2018 | 01/15/2018 | Quality Control | Concrete | View |
| 2017-11-29-14 | 11/29/2017 | 11/30/2017 | Quality Assurance | Concrete | View |
| 2017-10-26-6 | 10/26/2017 | 10/30/2017 | Quality Assurance | Concrete | View |
| 2017-10-17-4 | 10/17/2017 | 10/19/2017 | Quality Assurance | Concrete | View |
| 2017-10-13-5 | 10/13/2017 | 10/17/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-10-13-4 | 10/13/2017 | 10/17/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-08-10-2 | 08/10/2017 | 08/21/2017 | Verification | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
