Project Details
This page displays current information for project DEA: 044G5104.
Project Information
| Project Identifiers | Project ID: 211794 DEA: 044G5104 EFIS: 0412000483 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-31.4,32.6 |
| Award Date | 01/20/2017 |
| Closeout Date | 09/12/2019 |
| Work Description | BRIDGE CONSTRUCTION |
| Location Description | SOLANO COUNTY IN AND NEAR VACAVILLE AT MERIDIAN ROAD OVERCROSSING AND AT MIDWAY ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 01/03/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| quang.tran@dot.ca.gov | Quang Tran | Resident Engineer | Caltrans RE DB |
| joe.de.la.torre@dot.ca.gov | Joe De | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-03-30-4 | 03/30/2018 | 04/26/2018 | Quality Assurance | Concrete | View |
| 2018-02-28-2 | 02/28/2018 | 03/02/2018 | Quality Assurance | Concrete | View |
| 2018-02-28-1 | 02/28/2018 | 03/02/2018 | Quality Assurance | Concrete | View |
| 2018-02-12-2 | 02/12/2018 | 02/13/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-13 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-12 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-11 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-10 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-9 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
| 2018-01-23-8 | 01/23/2018 | 01/25/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
