Project Details
This page displays current information for project DEA: 043K1104.
Project Information
| Project Identifiers | Project ID: 211768 DEA: 043K1104 EFIS: 0417000079 |
|---|---|
| DIST-CO-RTE-PM | 04-SF-80-8.3, 8.30 |
| Award Date | 10/10/2016 |
| Closeout Date | 10/17/2019 |
| Work Description | Replace SAS tower anchor rod grout |
| Location Description | Bay Bridge |
| QA Service Level | 1 (Verified on 01/09/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| roberto.e.borja@dot.ca.gov | Roberto Borja | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-06-22-3 | 06/22/2017 | 06/26/2017 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2017-03-23-1 | 03/23/2017 | 03/30/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2017-01-25-5 | 01/25/2017 | 01/31/2017 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
