Project Details
This page displays current information for project DEA: 033C3804.
Project Information
| Project Identifiers | Project ID: 211614 DEA: 033C3804 EFIS: 0300000458 |
|---|---|
| DIST-CO-RTE-PM | 03-ED-50-75.4/77.3 |
| Award Date | 01/23/2017 |
| Closeout Date | 12/06/2021 |
| Work Description | HOT MIX ASPHALT, ROADWAY EXCAVATION, AND SIGNAL AND LIGHTING |
| Location Description | EL DORADO COUNTY IN SOUTH LAKE TAHOE FROM NORTH JUNCTION ROUTE 89 TO TROUT CREEK BRIDGE |
| QA Service Level | 1 (Verified on 10/20/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Jaret.Montplaisir@dot.ca.gov | Jaret Montplaisir | Resident Engineer | Caltrans RE DB |
| alfredo.carranza@dot.ca.gov | Alfredo Carranza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2018-10-03-32 | 10/03/2018 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
| 2018-10-03-31 | 10/03/2018 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
| 2017-10-05-24 | 10/05/2017 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
| 2017-10-05-23 | 10/05/2017 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
| 2018-10-03-30 | 10/03/2018 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
| 2018-10-03-29 | 10/03/2018 | 06/28/2019 | Per Request | Reclaimed Asphalt Pavement | View |
| 2018-10-03-28 | 10/03/2018 | 06/28/2019 | Per Request | Reclaimed Asphalt Pavement | View |
| 2017-10-05-22 | 10/05/2017 | 06/28/2019 | Per Request | Reclaimed Asphalt Pavement | View |
| 2017-10-05-21 | 10/05/2017 | 06/28/2019 | Per Request | Reclaimed Asphalt Pavement | View |
| 2017-10-05-20 | 10/05/2017 | 06/28/2019 | Per Request | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
