Project Details
This page displays current information for project DEA: 044J6304.
Project Information
| Project Identifiers | Project ID: 211364 DEA: 044J6304 EFIS: 0415000375 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-17.2 |
| Award Date | 06/28/2016 |
| Closeout Date | 12/21/2017 |
| Work Description | BUILD MATERIALS STORAGE BINS WITH CANOPY. |
| Location Description | SOLANO COUNTY IN FAIRFIELD MAINTENANCE STATION 2019 WEST TEXAS STREET |
| QA Service Level | 1 (Verified on 08/24/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| quang.tran@dot.ca.gov | Quang Tran | Resident Engineer | Caltrans RE DB |
| Chris.moulton@dot.ca.gov | Chris Moulton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-01-13-1 | 01/13/2017 | 01/17/2017 | Quality Control | Concrete | View |
| 2016-12-07-3 | 12/07/2016 | 12/09/2016 | Quality Control | Concrete | View |
| 2016-11-09-4 | 11/09/2016 | 11/11/2016 | Quality Control | Concrete | View |
| 2016-11-09-3 | 11/09/2016 | 11/11/2016 | Quality Control | Concrete | View |
| 2016-11-09-2 | 11/09/2016 | 11/11/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
